News
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Featured Posts
Archive
Please reload

Please reload

July 1, 2014

Design work started in March 2014 and we secured the planning consent 4 months later with no conditions attached. The period included all needed preliminary consultations. The job is due to start in October with view to be completed 6 months later. The tall and sleek 3 storey design, which doubles the total area of the original building, is in stark contrast with anything else in the area. While the extension doubles the total area of...

Please reload